The Best Crossword Puzzle Maker Online
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crossword Word Search Worksheet
Rate This Puzzle:
Log in or sign up to rate this puzzle.

EVM Crossword

Across
Schedule element that has zero duration
______ Path - the longest sequence of tasks from now to the schedule's end date
Original schedule data to which actual progress is compared
What logically links together two tasks
Restrictions set on the start or finish dates of a task
A gap between two tasks (delay)
An element of work with duration in the Integrated Master Schedule (IMS)
Amount of time required to complete a task
Down
Task planned after another task
Task planned before another task
Amount of time a task's finish date can slip before impacting the schedule's end date
An overlap between two tasks (acceleration)
Another term used for "float," also means "loose"
Task in the schedule that represents a roll-up of other scheduled tasks