The Best Crossword Puzzle Maker Online
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crossword Word Search Worksheet
Rate This Puzzle:
Log in or sign up to rate this puzzle.

Crossword Puzzle

Across
Project artifacts created and updated in various processes (e.g. risk register, issue log, change log, etc.)
How to guide that describes how the project will be executed, monitored and controlled, and closed.
Interactive communication tool for the exchange or project information.
Down
Raw data collected during the executing process group to be used later to analyze the performance of the project.
Expertise provided by a group or individual with specialized knowledge or training.
– Includes any scope changes, corrective actions, preventive