The Best Crossword Puzzle Maker Online
Powered by BrightSprout
Save Status:
or to save your progress. The page will not refresh.
Controls:
SPACEBAR SWITCHES TYPING DIRECTION
Answer Key:
Edit a Copy:
Make Your Own:
Crossword Word Search Worksheet
Rate This Puzzle:
Log in or sign up to rate this puzzle.

EAM/SM and Apps 10

IFS
Jerry Browning, Senior Advisor
Across
The "invoice rule" on a service contract to bill before the period of the contract.
What type of criteria parameter would you set up for a cycle counter reading?
If you change an equipment object on a work task after postings have already been transacted, your can RMB on the task and select "_____ and Update Accounting" to redirect the incorrect transactions.
This acronym is for maintenance software systems not integrated into an ERP
What is the equivalent of what an operation was to a work order on work tasks called? (two words)
This functionality is to automatically create a group of PMs against an equipment object. It is called PM program in Apps 10, but was called "___ Program" in previous Apps.
What's the abbreviation for Predictive Maintenance.
What is Standard Job called now? (two words)
What tab in Apps 10 do you use on work tasks to authorize labor and expenses?
What RMB preview takes the place of transfer to customer order functionality in Apps 10? (two words)
After creating a resource structure in Apps 10, you need to RMB on the line and select this (two words)
Where is a person and tool/equipment associated to their maintenance organization now? (two words)
Acronym for the account that's handled by new functionality allowing finance to recognize revenue after the work is completed.
What are tools and facilities called in Apps 10? (two words - _____/_________ )
The checkbox on a PM that allows Grouping on an object's PMs and then blending all the task steps under one task.
What work order view do the Work Task Summary checkboxes reside on? (two words)
Three letter abbreviation for a popular quality standard such as XXX9000
The three letter acronym for common equipment controllers (hint Allen-Bradley)
The way to tie sales parts to expenses for reporting on tasks is to set up a "Cost _________"
What's the acronym for a system monitoring software that might be interfaced with IFS for automatic measurements and alarm readings.
Work Order Quotation no longer exists, so now we exclusively us ________ Quotations.
Acronym for IFS's bar scanning bolt on solution
The invoice type on a service contract to use for automatic periodic billing is called "Invoice _____"
The easiest way to quickly issue hours against personnel and tools/equipment is RMB on the work task and select "Report ____"
What used to be called an operation on a Standard Job is called "work ____" in Apps 10?
Where an employee can find and report in on their assigned work orders (__ Workd)
Down
What are the quick reporting work order assistants called now?
What is the field an accumulated value drives the next PM off called? (field + interval = generation value) (two words)
This acronym is for maintenance software systems integrated into an ERP
This maintenance approach touting "run to failure" has gained popularity in the last decade and now has embedded components in Apps 10. (Acronymn)
What is the field name for the time required to perform a work task?
What two tab on work tasks do you delegate and report time on in Apps 10? Resources/Demands and "Work _____"
Tool for laying out configurable equipment/work structures for quoting that when executed builds an equipment structure? (two words)
What record do you go to select a dropdown selecting a status that will automatically create a new work task when a new work order is created?
The invoice rule on a service contract to bill after the period.
Where are persons and tools/equipment added to resource structures through the navigator for cost and sales parts in Apps 10? (two words)
What type of PM takes the place of Route PMs
If a customer is placed on this tab of an equipment object, the postings must be transferred to a CO or made Not Invoicable.
What is the primary field for starting a Structured Failure Management tree? (two words)
What type of equipment object works best for GIS interface (ESRI) "_______ Asset"
What type of criteria parameter would you set up for a temperature reading?
The best way to add expenses to a task now, is to RMB on the task line and select "Report _______ Transactions"
Where on the work order can you find the cause code of a work task that's been placed "OnHold".
Purchase order costs show up on the budget tab "Upon _______" now!
You can always change the equipment object description but once a transaction is made against and equipment object, you can't change the "Object __" (abbreviation)
This functionality to designate time frame thresholds that need met on responding to a service call has been enhanced in Apps 10 on Service Contracts (acronym)
The sub tab on the Service Tab on Service Contracts where the associated equipment is set up.
The three financial connections on an equipment object are "Cost Center, Group ID, and Fixed _____"
This is the acronym for the navigator used is setting up and maintaining structured assets.
Acronym for what used to be call Plant Design